I |
EQUIPMENTS FOR BORED PILING WORKS AND CRAWLER CRANE
|
QUANTITIES
|
CAPACITY
|
MANUFACTURER
|
1 |
Bored piling machine Sumitomo SD610 |
|
02 |
Dmax=2000mm
Lmax=60m |
Japan
|
2 |
Bored piling machine
Kobelco 7055 |
|
01 |
Q=55T;R=3-23.6m; H=29m |
Japan
|
3 |
Bored piling machine
Hitachi KH 180 -3 |
|
01 |
Dmax=2000mm, Lmax=65m
Q=50T; R=3.7-25.3m; H=28m |
Japan
|
4 |
Bored piling machine
Hitachi KH 125 -3 |
|
01 |
Q=35T;R=3.0-20m; H=22m |
Japan
|
5 |
Crawler crane Sumitomo SD610 |
|
06 |
Year of manufacture: 2000
Q=60T;R=3-27.4m; H=29m |
Japan
|
6 |
Crawler crane HITACHI –180-3 |
|
06 |
Q=50T; R=3.7-25.3m; H=28m |
Japan
|
7 |
Line of bored piling equipments |
|
01 |
|
Japan
|
II |
BULLDOZER & GRADER |
|
|
|
1 |
Bulldozer |
|
10 |
P= 110CV |
Japan |
2 |
Grader |
|
10 |
P= 110CV |
Japan |
III |
ROLLER |
|
|
|
1 |
Vibrating roller |
|
11 |
16-24T |
|
2 |
Static roller |
|
11 |
8-16T |
|
IV |
TOWER CRANE |
|
|
|
1 |
Tower crane SCM C6015 |
|
01 |
Q=8T;R=60m; H=140m
|
China |
2 |
Tower crane Zoomlion TC 5613A |
|
01 |
Q=8T; R=56m;
H=150m |
China |
3 |
Tower crane SCM C5015 |
|
01 |
|
China |
4 |
Tower crane Potain MC115B |
|
01 |
Q=6T; R=55m;
H=140m |
China |
5 |
Tower crane Topkit |
|
01 |
|
China |
6 |
Tower crane KB 403A |
|
02 |
|
Russia |
7 |
Climbing crane S110 TG8 (R50/20) |
|
02 |
Q=8T; R=54m;
H=160m |
China |
8 |
Tower crane TC5013 |
|
02 |
Q=5T; R=50m;
H=150m |
China |
9 |
Tower crane TC5513 |
|
01 |
Q=6T; R=55m;
H=141.8m |
China |
V |
HOIST |
|
|
|
1 |
Twin cage hoist Liftec MS 2030T |
|
03 |
Q=4T; H=280m; Lifting speed: 0-55m/ph
|
Korea |
2 |
Twin cage hoist VPV 200/200 |
|
01 |
Q=2T; H=200m |
Vietnam– France |
3 |
Cage hoist Model SC100 – 01 cage |
|
01 |
Q=1T; H=100m |
China |
4 |
Twin cage hoist Model GJJSC 200/200 TD |
|
05 |
Q=4T; H=100m-250m |
China |
5 |
Cage hoist Liftec MS 1030T |
|
05 |
Q=2T; H=100m |
China |
VI |
EXCAVATOR |
|
|
|
1 |
Sumitomo-S340-2 |
|
05 |
V=0.8m3,
H= 6510m,
Moving speed: 5.0km/h |
Japan |
2 |
Kobelco SK 07 |
|
08 |
V=0.7m3
|
Japan |
3 |
Hitachi |
|
02 |
V=1.6m3
|
Japan |
VII |
FORMWORK |
|
|
|
1 |
Climbing formwork Kumkang |
|
2.000 m2 |
This is type of automatic climbing formwork, very convenient in the construction process and shortens the project schedule. |
Korea
|
2 |
Aluminum formwork
|
|
10.000 m2 |
-Aluminum formwork technology is particularly suited to the typical floors, used for construction of a floor but can be applied for 3 floors. This equipment is used to build walls, beams and floors, Which helps to shorten construction time and save costs. |
Korea
|
3 |
Scaffolding system Pal D48, D50, D68, D76 |
|
142 sets |
– With the advantages of saving and safety, Pal scaffolds sellected to use for all buildings with complex structures in high positions. This type of equipment is made of steel, light, simple and convenient in erection, dismantling and transportation, which helps to reduce costs for the project.
án. |
Vietnam- China
|
4 |
Minh Khai scaffold |
|
31 bộ |
|
Vietnam |
5 |
Steel formwork |
|
12.000 m2 |
|
Vietnam – China |
VIII |
GENERATOR |
|
|
|
1 |
Generator Misubishi, Suntec |
|
10 |
200-250KVA |
Japan |
IX |
SHEETPILE |
|
|
|
1 |
Sheetpile |
|
2.074 md |
|
|
X |
TRUCK |
|
|
|
1 |
Truck |
|
25 |
P= 10T-15T |
Russia
|
XI |
GONDOLLA |
|
|
|
|
Hanging scaffold |
|
04 |
Q= 800kg; H=136m; V= 8-10m/a minute |
China |
XII |
LIFT |
|
|
|
1 |
Lift |
|
5 |
Year of manufacture: 2011 |
China |
And other equipments and divices |